Trevor the traction engine arrived today.
This is a record of the model railway that I am building for my 3 grandsons.
Wednesday, March 31, 2021
Monday, March 8, 2021
Friday, February 19, 2021
Devious Diesel
This morning this model class 08 diesel arrived.
I have added the face to convert it into Devious Diesel.
Friday, January 22, 2021
Douglas Part 3
Today a sheet of suitable transfers arrived.
I removed the old transfers from Douglas and added the No.10 to the tender.
Friday, January 15, 2021
Douglas Part 2
Monday, January 11, 2021
Douglas
This loco arrived this morning, it is similar to Douglas.
Appropriate as Douglas was my father's name, the boys great grandfather.
Signals
These signals arrived this morning, they will need some work on them.
Monday, January 4, 2021
Metal Wheels for the Riding Coach
This morning a set of metal disc wheels arrived and I have fitted them to the riding coach.
Close-up of one of the bogies with the new wheels fitted.
Bundle of Wagons
This morning this bundle of of 5 wagons arrived, I was specifically after the Heinz Beans Wagon.
I have fitted 3 of them with replacement metal wheels, the other 2 wagons already had them fitted.
Thursday, December 31, 2020
Open Wagon for Breakdown Train
This morning this open truck arrived, it is the final piece for the breakdown train.
Thursday, December 24, 2020
Tool Van
The tool van which goes with the breakdown train arrived this morning.
Wednesday, December 23, 2020
Riding Coach
This morning the riding coach arrived in the post. It is used for the breakdown crew to travel in.
This nearly completes the breakdown crane set.
Tuesday, December 22, 2020
Restoration of the 75 Ton Crane Part 6
This morning the outriggers for the crane arrived in the post.
These are fitted when the crane is in use to stop it toppling over when lifting items alongside the crane.
The Allen keys in the ends of the outriggers are used to adjust the height according to the terrain.
Outriggers fitted ready for the jib to be swung.
Friday, December 18, 2020
Thursday, December 17, 2020
Tuesday, December 15, 2020
Restoration of the 75 Ton Crane Part 4
This morning I painted the axle boxes yellow on all 4 vehicles.
The long match truck.
Monday, December 14, 2020
Restoration of the 75 Ton Crane Part 3
This morning I fitted chains to lift and lower the jib and to raise and lower the hook.
The jib lowered onto the match truck.
Sunday, December 13, 2020
Restoration of the 75 Ton Crane Part 2
I have repainted the crane and match trucks yesterday and this morning by touching up the paint chips on the original red on the crane, and blacking it's underframe.
I completely repainted the 3 match trucks in the matching red paint and also black underframes.
Saturday, December 12, 2020
Restoration of the 75 Ton Crane Part 1
This morning I started the restoration of the 75Ton crane.
I have primered the 3 plastic match trucks which require a complete repaint to match the crane.
Friday, December 11, 2020
75 Ton Crane
This 75 Ton crane and accompanying match trucks arrived this morning.



































