Friday, June 18, 2021

Friday, April 23, 2021

Station Building and Platform

 Today this station building arrived, it goes with the platform which I already had.


It is rather grand looking from the road side.





Friday, April 16, 2021

Goods Shed, Water Tower and Point Lever

 This morning 3 items arrived for the railway, a goods shed.

The doors can be slid open.


And can be slid closed.




This is a water tower to store water used for the steam engines.



And finally a lever to operate the point.

Monday, March 8, 2021

Old Slow Coach

This morning "Old Slow Coach" arrived in the post.

I have fitted metal wheels to it.



It goes with Duck, both being from the GWR.
 


Friday, February 19, 2021

Devious Diesel

This morning this model class 08 diesel arrived.

I have added the face to convert it into Devious Diesel.



Friday, January 22, 2021

Douglas Part 3

 Today a sheet of suitable transfers arrived.

I removed the old transfers from Douglas and added the No.10 to the tender.

Friday, January 15, 2021

Douglas Part 2

A new set of wheels and axles for the tender drive arrived this morning.

The original rubber tyres were perished and one was missing so needed replacing.


In the same package was a replacement set of Hornby couplings to replace the Airfix ones.

The new Hornby coupling fitted to the tender and the old Airfix coupling alongside.


The new Hornby coupling fitted to the loco and the old Airfix coupling alongside.


These will now better match the Hornby couplings on all the coaches and wagons.

Monday, January 11, 2021

Douglas

 This loco arrived this morning, it is similar to Douglas.

Appropriate as Douglas was my father's name, the boys great grandfather.


I have added a face to the smoke box and carried out some repairs.



Signals

 These signals arrived this morning, they will need some work on them.


Since purchasing these 3 signals last November, on 19th February 2021, I managed to get 2 more plus some bits.

I will replace the taller of the single signals with one of the new ones and add the other.

I also replaced the "yellow" distance signal with a red "home" signal on the junction mast which will be more appropriate. 

This completes the main signals I will install on the layout. 


This is the ground signal, I have painted it. 
It is for the goods siding.


Keith

Monday, January 4, 2021

Metal Wheels for the Riding Coach

 This morning a set of metal disc wheels arrived and I have fitted them to the riding coach.

Close-up of one of the bogies with the new wheels fitted.


The complete coach with all 4 wheelsets fitted.

Bundle of Wagons

 This morning this bundle of of 5 wagons arrived, I was specifically after the Heinz Beans Wagon.

I have fitted 3 of them with replacement metal wheels, the other 2 wagons already had them fitted.



Thursday, December 31, 2020

Open Wagon for Breakdown Train

 This morning this open truck arrived, it is the final piece for the breakdown train. 


It is to carry the stabilizers for the crane and the Allen key to adjust them.


The complete breakdown train.

Thursday, December 24, 2020

Tool Van

 The tool van which goes with the breakdown train arrived this morning.


Here it is with the crane and riding coach.

Wednesday, December 23, 2020

Riding Coach

 This morning the riding coach arrived in the post. It is used for the breakdown crew to travel in.

This nearly completes the breakdown crane set.




Tuesday, December 22, 2020

Restoration of the 75 Ton Crane Part 6

 This morning the outriggers for the crane arrived in the post.

These are fitted when the crane is in use to stop it toppling over when lifting items alongside the crane.

The Allen keys in the ends of the outriggers are used to adjust the height according to the terrain.

Outriggers fitted ready for the jib to be swung. 


Jib safely swung. 

Friday, December 18, 2020

Toad and the Other Brake Van Faces

 This morning I added a face to Toad the GWR brake van.

I also added a face to the other brake van.

Thursday, December 17, 2020

Tuesday, December 15, 2020

Restoration of the 75 Ton Crane Part 4

 This morning I painted the axle boxes yellow on all 4 vehicles.

The long match truck.


The 1st short match truck.


The crane.


The 2nd match truck.